No Nama Peserta K A T ST P PT HN H P PK Alasan
1 cv.garis perak consultant - 03.189.367.0-331.000 65,14 Rp. 109.637.000,00
Rp. 109.637.000,00
2 PT. MULTI STRUKTUR AROYA - 02.004.988.8-331.000 79,79 Rp. 110.330.000,00
Rp. 110.330.000,00
3 PT. SINAR KUMBANG SAKTI - 74.858.036.2-331.000

4 PT.WIRNESS UNION ENGINEERING - 01.654.971.9-331.000

5 PT. Sidlacom Engineer Consultant - 01.514.724.2-331.000

6 KAWAT EMAS - 31.711.329.8-331.000

7 CV. GEOTEKNIK PRIMA RAYA KONSULTAN - 01.535.571.2-331.000

8 CV. MITRA YENUKO PRATAMA - 01.514.887.7-331.000

9 CV. MEDIA TEKNIK KONSULTAN - 03.074.815.6-331.000

10 CV. Activa Engineering Consultant - 03.137.295.6-331.000

11 CV. MULTI GUNA - 75.440.158.6-331.000

12 RILI JAYA CV - 76.564.289.7-331.000

13 cv,jaya hutama selaras - 73.328.654.6-331.000

14 CV.RAMA CONSULTANT ENGINEERING - 01.887.246.5-331.000

  • A Evaluasi Administrasi
  • T Evaluasi Teknis
  • ST Skor Teknis
  • P Penawaran
  • PT Penawaran Terkoreksi
  • HN Hasil Negosiasi
  • SH Skor Harga
  • SA Skor Akhir
  • K Evaluasi Kualifikasi
  • SK Skor Kualifikasi
  • SB Skor Pembuktian
  • H Evaluasi Harga/Biaya
  • P Pemenang
  • PK Pemenang Berkontrak